/ Project
Time Inc (former IPC Media) Headquarters
Design goal was to achieve maximum future space flexibility while still catered to each magazine tenant needs in the building.
Name
Time Inc (former IPC Media) Headquarters
Location
London, United Kingdom
Architect
Allies and Morrison / TP Bennett
Client
IPC Media
Area/Size
500,000 ft²
Development Type
Refurbishment / Headquarters (Interiors Fit-Out) Fit-Out
dsa ENGINEERING provided the complete M&E fit-out design from the developer’s core finish for this new building. DSA was instrumental in assisting IPC in selecting a developer for this pre-let project, and we prepared a Tenant's Requirements Specification to enable developers to propose on this build-to-suit project.
The design included a 4,000 kVA standby generator plant, 1,000 kVA UPS system, a 750 kW 24-hour supplemental cooling system for the comms room and hub rooms, a 450-cover kitchen and dining facility, critical magazine production areas with full back-up electrical supplies and air conditioning, general office areas, meeting rooms, conference areas, and test kitchens for the multiple magazines owned by Time Inc.